Commercial electrician, Wimberley

Commercial Electrician in Wimberley, TX

Commercial electrical maintenance, repairs and projects for Wimberley facilities, from our shop in Round Rock.

Something down right now? Call (737) 301-4536

Permits and inspections in Wimberley

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: City of Wimberley Permitting Department at City Hall. Applications and plans go to the city by email; no online permit portal was found.

  • 02

    How to apply: Email the commercial building permit application and electronic plans to the city's permits office. Commercial projects need a site plan review before a permit is issued, and COMcheck energy compliance when conditioned area changes. The city says all electrical contractors must be licensed by the State of Texas.

  • 03

    Typical review time: The city's FAQ says commercial building permits typically take 10 to 14 days (residential about 7 days).

  • 04

    Inspections: Call the city's permitting department to request inspections at each stage. Permits generally expire after 180 days if no inspections are made.

  • 05

    What to know locally: The city's FAQ gives moving or adding an electrical outlet as an example of work that needs a permit. Adopted codes are listed in Chapter 4 (Building Regulations) of the city code.

  • 06

    Utility coordination: Pedernales Electric Cooperative (PEC). PEC asks for a 911 address, the service size in amps, and for commercial sites a warranty deed, approved site plan and plat. A one-line diagram may be needed. PEC notes some areas require a city inspection before it connects service.

Wimberley questions

  • 01

    Do I need a permit to add an outlet or circuit in Wimberley? Usually yes. The city says an electrical permit may be needed for any addition or change to a building's system, and gives moving or adding an outlet as an example.

  • 02

    How long does a commercial permit take in Wimberley? The city's FAQ says commercial building permits typically take 10 to 14 days. Commercial projects also need a site plan review first.

  • 03

    Who can do electrical work on my building in Wimberley? The city says all electrical contractors must be licensed by the State of Texas.

Recent work near Wimberley

Our recent projects are in Austin, Round Rock and Burnet. See the case studies.

Wimberley facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-01 from: cityofwimberley.com cityofwimberley.com mypec.com mypec.com. Rules change; we confirm them on every permit.