Commercial electrician, Weir

Commercial Electrician in Weir, TX

Commercial electrical maintenance, repairs and projects for Weir facilities, from our shop in Round Rock.

Something down right now? Call (737) 301-4536

Permits and inspections in Weir

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: Not published. Weir is an incorporated city in Williamson County. No readable official city page on permits was found (a likely city website blocked automated reading), so the permit process could not be confirmed. Contact the city directly.

  • 02

    How to apply: Not published (could not be read). Statewide, TDLR requires that non-exempt electrical work be done by licensed electricians through a licensed electrical contractor, and projects estimated at $50,000 or more must be registered with TDLR for accessibility review.

  • 03

    What to know locally: Weir's code adoption, contractor registration and inspection arrangements could not be confirmed online. Williamson County's own pages also blocked automated reading.

  • 04

    Utility coordination: Oncor and Pedernales Electric Cooperative (Oncor lists Weir among the cities it serves, and PEC's tariff lists Weir as a franchise city; check by address). Before Oncor energizes, the meter socket must meet its specifications, an external main disconnect must be installed if required, all work at the socket must be finished, and each meter location must be marked with its physical address. An approved inspection (green tag) must be on the ESI ID. Where PEC serves, it asks for a 911 address, the service size in amps, a deed, and for commercial sites an approved site plan and plat, and it may require a one-line diagram.

  • 05

    Typical review time: Not published by the city.

  • 06

    Inspections: Not published by the city.

Weir questions

  • 01

    Who delivers electricity in Weir? Both Oncor and Pedernales Electric Cooperative list Weir in their service areas, so confirm the provider for the address before design.

  • 02

    What must be finished before Oncor sets a meter? A compliant meter socket, an external main disconnect if required, each meter location marked with its address, and an approved inspection on the ESI ID.

  • 03

    Is TDLR accessibility registration needed for a commercial build-out? TDLR says projects with a total estimated cost of $50,000 or more must be registered and reviewed by a Registered Accessibility Specialist.

Recent work near Weir

Our recent projects are in Austin, Round Rock and Burnet. See the case studies. We also serve the nearby communities of Jonah, Mozo and Walburg.

Weir facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-02 from: oncor.com oncor.com mypec.com mypec.com tdlr.texas.gov tdlr.texas.gov. Rules change; we confirm them on every permit.