Commercial electrician, Timberwood Park
Commercial Electrician in Timberwood Park, TX
Commercial electrical maintenance, repairs and projects for Timberwood Park facilities, from our shop in Round Rock.
Something down right now? Call (737) 301-4536What Timberwood Park facilities call us for
For Timberwood Park facilities, most calls come down to two kinds of work:
Facility maintenance and repair.
Troubleshooting, panels, lighting, equipment power and recurring maintenance, with a written report after every visit.
Facility MaintenanceCommercial projects.
Tenant improvements, equipment power and service upgrades, designed, permitted and closed out by one electrical contractor.
Commercial ProjectsPermits and inspections around Timberwood Park
Timberwood Park is unincorporated, so Bexar County rules apply.
Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.
- 01
Who issues electrical permits: Timberwood Park is unincorporated, with no city government. The Bexar County Fire Marshal's Office issues building permits for commercial, public-accessible and multi-family buildings in unincorporated Bexar County, after a Building Permit Authorization from Bexar County Public Works.
- 02
How to apply: Get a Building Permit Authorization (BPA) from Bexar County Public Works, then submit two sets of architectural plans, the application, the signed BPA and the fee to the Fire Marshal. Plans must include a site plan, floor plan, elevations, an electrical layout and an HVAC layout. Bexar County says projects in the San Antonio ETJ should also check with the City of San Antonio Planning and Development Services Department for city requirements.
- 03
Typical review time: Bexar County says it has 30 days to review and issue or deny a building permit.
- 04
Inspections: Bexar County requires at least a structural frame inspection, an electrical rough-in inspection, an HVAC rough-in inspection and a final inspection before the Certificate of Occupancy. Call the Fire Marshal's Office to arrange inspections.
- 05
What to know locally: Bexar County applies the 2021 International Fire and Building Codes with county amendments, effective January 1, 2024, and does not enforce City of San Antonio local amendments. Permit fees use a minimum construction cost of $25 per square foot. Permits are valid for 180 days.
- 06
Utility coordination: Not confirmed on an official page for Timberwood Park. If the site is on CPS Energy, commercial service needs a load sheet, a signed and sealed utility site plan and one-line diagram, and the local electric inspection release before CPS sets the meter, then about 10 business days to energize. Small commercial is under 300 kVA and large commercial is 300 kVA or more.
Timberwood Park questions
- 01
Does Bexar County inspect electrical work in Timberwood Park? Yes, for permitted commercial buildings. The county requires an electrical rough-in inspection and a final inspection before the Certificate of Occupancy.
- 02
How long does Bexar County take to issue a commercial building permit? The county says it has 30 days to review and issue or deny a permit.
- 03
Do San Antonio's building code amendments apply in Timberwood Park? Bexar County says it does not enforce City of San Antonio local amendments, but projects in the San Antonio ETJ should check with the city for its requirements.
Recent work near Timberwood Park
Our recent projects are in Austin, Round Rock and Burnet. See the case studies. We also serve the nearby communities of Specht Store.
Timberwood Park facility? Start with the assessment.
You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.
Or call (737) 301-4536.
Sources
Permit and utility facts checked 2026-11-02 from: bexar.org cpsenergy.com. Rules change; we confirm them on every permit.