Commercial electrician, Sunrise Beach Village

Commercial Electrician in Sunrise Beach Village, TX

Commercial electrical maintenance, repairs and projects for Sunrise Beach Village facilities, from our shop in Round Rock.

Something down right now? Call (737) 301-4536

Permits and inspections in Sunrise Beach Village

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: City of Sunrise Beach Village, Development, Building Permits and Code Compliance department at City Hall, 124 Sunrise Drive. Applications are PDF forms; questions go to the permit department. Fees can be paid online or by check at City Hall.

  • 02

    How to apply: File the city's Development Permit Application Package, with fee payment. Construction of a commercial building is a listed permit purpose, and development in a Commercial Zoning District requires a preliminary meeting with city officials. Plans must conform to the city's adopted codes and include a site plan and an electric plan. The form asks for the electrical contractor's license number.

  • 03

    Inspections: The permit holder is responsible for the inspections the city code requires and must submit proof of passed inspections to the city building official. An Inspection Completion Record is kept on site with the posted permit. Missing or failed inspections lead to a stop work order.

  • 04

    What to know locally: A Certificate of Occupancy is required before a commercial property is occupied and before permanent utilities are turned on. Shoreline electrical outlets and motors must be above the floodplain level or GFCI protected. Starting work without a permit doubles the permit fee. Zoning rules are in Ordinance 347.5.

  • 05

    Utility coordination: Central Texas Electric Cooperative (CTEC). The city's permit form requires a CTEC approval form for solar installations. For new construction, CTEC asks you to contact Member Services with the 911 address and service type (commercial is one), then meet a staking technician on site. All paperwork and fees must be complete before CTEC starts construction, and it publishes wiring specifications and easement forms.

  • 06

    Typical review time: Not published by the city.

Sunrise Beach Village questions

  • 01

    Who schedules inspections in Sunrise Beach Village? The permit holder. The city requires proof of each passed inspection to be submitted to the building official and recorded on the posted permit.

  • 02

    Can a new business turn on permanent power before a Certificate of Occupancy? No. The city says a Certificate of Occupancy is required before permanent utilities are turned on.

  • 03

    Does solar need extra approval in Sunrise Beach Village? Yes. The permit application requires a CTEC approval form for solar panel installations.

Recent work near Sunrise Beach Village

Our recent projects are in Austin, Round Rock and Burnet. See the case studies. We also serve the nearby communities of Click.

Sunrise Beach Village facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-02 from: sunrisebeachtx.gov sunrisebeachtx.gov sunrisebeachtx.gov ctec.coop. Rules change; we confirm them on every permit.