Commercial electrician, Stonewall

Commercial Electrician in Stonewall, TX

Commercial electrical maintenance, repairs and projects for Stonewall facilities, from our shop in Round Rock.

Something down right now? Call (737) 301-4536

Permits and inspections around Stonewall

Stonewall is unincorporated, so Gillespie County rules apply.

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: Stonewall is unincorporated, with no city government. The Gillespie County Engineering Department, at the courthouse in Fredericksburg, handles development and floodplain permits, right-of-way and driveway permits, and subdivisions.

  • 02

    How to apply: Gillespie County requires a Development Permit Determination Form before developing a property, including new construction, grading and paving. The Engineering Department either answers that no more county permitting is needed or sends a Development Permit Application and checklist, based on the floodplain and the scope of work. A right-of-way permit is needed before building or changing a driveway or other improvements in public right-of-way. The county does not list building or electrical permits.

  • 03

    What to know locally: There is no city electrical inspection in Stonewall. Gillespie County's development permit focuses on floodplain and site review. Floodplain determinations for septic systems also go through the County Engineer's office, and right-of-way permits expire 6 months after approval.

  • 04

    Utility coordination: Not confirmed on an official page for Stonewall. Pedernales Electric Cooperative (PEC) lists Gillespie County in its service area, and Central Texas Electric Cooperative (CTEC) has a Fredericksburg office. If the site is on PEC, new commercial service needs a site plan, a one-line diagram, the 911 address, a warranty deed, a plat and the service size in amps. If the site is on CTEC, you contact Member Services with the 911 address and service type, meet a staking technician on site, and complete all paperwork and fees before CTEC starts construction.

  • 05

    Typical review time: Not published by the city.

  • 06

    Inspections: Not published by the city.

Stonewall questions

  • 01

    Who issues permits for a commercial project in Stonewall? Stonewall is unincorporated. Gillespie County Engineering handles development, floodplain and right-of-way permits. The county does not list building or electrical permits.

  • 02

    What is the first county form for a new building near Stonewall? A Development Permit Determination Form. The county uses it to decide whether a full Development Permit Application is needed.

  • 03

    Do I need a county permit for a new driveway near Stonewall? Yes. Gillespie County requires a right-of-way permit before building or changing improvements in public right-of-way.

Recent work near Stonewall

Our recent projects are in Austin, Round Rock and Burnet. See the case studies. We also serve the nearby communities of Albert, Blumenthal, Lindendale and Willow City.

Stonewall facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-02 from: gillespiecounty.gov gillespiecounty.gov mypec.com ctec.coop. Rules change; we confirm them on every permit.