Commercial electrician, Smithville
Commercial Electrician in Smithville, TX
Commercial electrical maintenance, repairs and projects for Smithville facilities, from our shop in Round Rock.
Something down right now? Call (737) 301-4536What Smithville facilities call us for
For Smithville facilities, most calls come down to two kinds of work:
Facility maintenance and repair.
Troubleshooting, panels, lighting, equipment power and recurring maintenance, with a written report after every visit.
Facility MaintenanceCommercial projects.
Tenant improvements, equipment power and service upgrades, designed, permitted and closed out by one electrical contractor.
Commercial ProjectsPermits and inspections in Smithville
Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.
- 01
Who issues electrical permits: City of Smithville City Hall; plans are approved by the city's Building Official.
- 02
How to apply: Contact City Hall, then submit plans for Building Official approval. Commercial and industrial construction follows a similar process and may need extra consultation. If the property is not your homestead, a licensed electrician must do the electrical work.
- 03
Typical review time: Building plan review can take up to 10 full workdays, starting the day after plans are turned in.
- 04
Inspections: Call City Hall with 24 hours' notice for each stage. Inspections generally include rough-in plumbing and electrical, and a final.
- 05
What to know locally: The city's permit guide says new electrical lines or service upgrades must be installed underground.
- 06
Utility coordination: City of Smithville (municipal electric utility); Bluebonnet Electric Cooperative serves part of Smithville. Call City Hall at least 3 weeks before you need a city connection; a deposit or tap fee applies to new installations. New electrical lines and upgrades must be underground. A certificate of occupancy may be required before full service.
Smithville questions
- 01
How long does plan review take in Smithville? The city says building plan review can take up to 10 complete workdays.
- 02
How do I request an inspection in Smithville? Call City Hall and give 24 hours' notice for each stage of construction.
- 03
Can a service upgrade in Smithville be overhead? No. The city's permit guide says new electrical lines or upgrades must be underground.
Recent work near Smithville
Our recent projects are in Austin, Round Rock and Burnet. See the case studies.
Smithville facility? Start with the assessment.
You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.
Or call (737) 301-4536.
Sources
Permit and utility facts checked 2026-11-01 from: ci.smithville.tx.us ci.smithville.tx.us ci.smithville.tx.us bluebonnet.coop. Rules change; we confirm them on every permit.