Commercial electrician, Selma
Commercial Electrician in Selma, TX
Commercial electrical maintenance, repairs and projects for Selma facilities, from our shop in Round Rock.
Something down right now? Call (737) 301-4536What Selma facilities call us for
For Selma facilities, most calls come down to two kinds of work:
Facility maintenance and repair.
Troubleshooting, panels, lighting, equipment power and recurring maintenance, with a written report after every visit.
Facility MaintenanceCommercial projects.
Tenant improvements, equipment power and service upgrades, designed, permitted and closed out by one electrical contractor.
Commercial ProjectsPermits and inspections in Selma
Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.
- 01
Who issues electrical permits: City of Selma Permits and Inspections, City Hall, 9375 Corporate Drive. The city posts a permit application and separate commercial permit and inspection guidelines, and lists a dedicated commercial permit contact.
- 02
How to apply: File the city's Permit Application with the items in the Commercial Building Permit Application Guidelines. The general contractor applies for the building permit. Each licensed trade contractor, including electrical, must register with the city and submit its own permit application and valuation for its portion of the work. Registration needs the city form, a copy of the state license and a copy of the license holder's driver's license; the city charges no registration fee at this time.
- 03
Inspections: The City of Selma performs inspections, and the general contractor is responsible for calling them in. Inspections called in before 12 p.m. are scheduled for the next day. If the site is not ready, a re-inspection fee applies and the re-inspection is at least 48 hours later.
- 04
What to know locally: Selma has adopted the 2020 National Electrical Code with the 2021 International Codes and the 2018 International Existing Building Code, plus local amendments. Each inspection point needs a passing report before the next inspection. Detention design criteria generally follow the City of San Antonio.
- 05
Utility coordination: Not confirmed on an official page for Selma. The city's Utilities page covers water, wastewater (Cibolo Creek Municipal Authority) and trash, but does not name an electric provider. Confirm the provider for the address before design.
- 06
Typical review time: Not published by the city.
Selma questions
- 01
Which electrical code does Selma use? The 2020 National Electrical Code, along with the 2021 International Codes and local amendments.
- 02
Does my electrical contractor need its own permit in Selma? Yes. The city says each licensed trade contractor must register and submit its own permit application for its portion of the work.
- 03
When should I call for an inspection in Selma? Before 12 p.m. for a next-day inspection, and only when the work is ready.
Recent work near Selma
Our recent projects are in Austin, Round Rock and Burnet. See the case studies.
Selma facility? Start with the assessment.
You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.
Or call (737) 301-4536.
Sources
Permit and utility facts checked 2026-11-02 from: ci.selma.tx.us ci.selma.tx.us ci.selma.tx.us ci.selma.tx.us ci.selma.tx.us. Rules change; we confirm them on every permit.