Commercial electrician, Rollingwood

Commercial Electrician in Rollingwood, TX

Commercial electrical maintenance, repairs and projects for Rollingwood facilities, from our shop in Round Rock.

Something down right now? Call (737) 301-4536

Permits and inspections in Rollingwood

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: City of Rollingwood Development Services, City Hall, 403 Nixon Drive. All permit applications go through My Government Online (MGO), the city's official permitting software.

  • 02

    How to apply: Submit residential and commercial building permit applications through MGO; some paper forms are uploaded into the online application. Commercial Certificate of Occupancy applications also go through the city's permit application page, and a new CO is required for a change in owner, tenant, business name or use. The city posts building permit checklists and a fee schedule.

  • 03

    Inspections: ATS Engineers perform the city's inspections. Schedule them through MGO, or contact Development Services if you cannot. Inspections called in before 4 p.m. are scheduled for the next day. All inspections must be prepaid before a permit is issued, and all inspections listed on the plan review are required for occupancy.

  • 04

    What to know locally: Construction hours are 7 a.m. to 7 p.m., Monday through Friday, with no work on weekends or city holidays except limited quiet interior work on Saturdays from 10 a.m. to 4 p.m. Construction traffic must use Rollingwood Drive at Bee Caves Road. The city adopted a Commercial Lighting and Signage Manual in June 2024. Building code rules are in Chapter 101 of the city code.

  • 05

    Utility coordination: Austin Energy. Austin Energy lists the City of Rollingwood in its service area. Commercial projects over 350 amps single-phase or 225 amps three-phase go through Austin Energy's commercial process, with an Electric Service Planning Application (ESPA) for every address, a site plan CAD file and a riser diagram. Austin Energy says its electric service permit is applied for through Austin Development Services.

  • 06

    Typical review time: Not published by the city.

Rollingwood questions

  • 01

    Who inspects construction in Rollingwood? ATS Engineers perform the city's inspections. Requests made before 4 p.m. are scheduled for the next day.

  • 02

    Does a new tenant need a new Certificate of Occupancy in Rollingwood? Yes. The city requires a new CO for a change in owner, tenant, business name, or use.

  • 03

    Who provides electric service in Rollingwood? Austin Energy lists the City of Rollingwood in its service area.

Recent work near Rollingwood

Our recent projects are in Austin, Round Rock and Burnet. See the case studies.

Rollingwood facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-02 from: rollingwoodtx.gov rollingwoodtx.gov rollingwoodtx.gov austinenergy.com austinenergy.com. Rules change; we confirm them on every permit.