Commercial electrician, Point Venture

Commercial Electrician in Point Venture, TX

Commercial electrical maintenance, repairs and projects for Point Venture facilities, from our shop in Round Rock.

Something down right now? Call (737) 301-4536

Permits and inspections in Point Venture

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: Village of Point Venture Building Permits and Inspections Department, Village Office, 411 Lohman Ford Road. Forms are posted as PDFs; applications and project packets are turned in at the Village Office, Monday through Friday.

  • 02

    How to apply: Download the Basic Development Building/Remodeling Permit Application (it has a Non-Residential option) or call the Village Office for forms, then turn the packet in at the office. The application asks for a site plan and a lot survey by a licensed surveyor. The village posts Minimum Building Plan Submission Standards. Permits cover all new construction, including commercial.

  • 03

    Inspections: The village says inspections are completed for all permits that require them, and the Building Permits and Inspections Department coordinates all permitting and inspection. How to request one is not published; call the Village Office.

  • 04

    What to know locally: The village says electrical work needs a permit, including new electrical service, solar panel installation, service upgrades or relocations, and new wiring and equipment. Water service is from the Point Venture WCID, which may require its own permit for some plumbing work. The village posts LCRA erosion control and construction hour rules.

  • 05

    Utility coordination: Pedernales Electric Cooperative (PEC). Point Venture is on PEC's list of franchise cities it serves. For new commercial service PEC asks for a site plan, a one-line electrical diagram, the 911 address, a warranty deed, an approved site plan and plat, and the service size in amps. PEC notes some areas require a city inspection before it connects.

  • 06

    Typical review time: Not published by the city.

Point Venture questions

  • 01

    Does a service upgrade need a permit in Point Venture? Yes. The village lists new electrical service, service upgrades or relocations, solar panels and new wiring as permit work.

  • 02

    Do commercial projects need a village permit in Point Venture? Yes. The village says permits are required for all new construction, including commercial, multifamily and residential.

  • 03

    Where do I turn in a permit application in Point Venture? At the Village Office, 411 Lohman Ford Road, Monday through Friday during business hours.

Recent work near Point Venture

Our recent projects are in Austin, Round Rock and Burnet. See the case studies.

Point Venture facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-02 from: vopv.org vopv.org vopv.org mypec.com mypec.com. Rules change; we confirm them on every permit.