Commercial electrician, New Braunfels

Commercial Electrician in New Braunfels, TX

Commercial electrical maintenance, repairs and projects for New Braunfels facilities, from our shop in Round Rock.

Something down right now? Call (737) 301-4536

Permits and inspections in New Braunfels

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: City of New Braunfels Development Services, Building Safety Division, through the Online Permit Portal (nbpermits.nbtexas.org).

  • 02

    How to apply: Apply online; electrical is a stand-alone permit type, and only license holders or authorized signers can apply for electrical permits. Electrical contractors must register with the Building Safety Division through the portal with a state license, photo ID and a certificate of liability insurance naming the city ($300,000 minimum).

  • 03

    Inspections: Request inspections in the online portal only; emailed requests stopped August 19, 2024. Commercial inspections are scheduled for the next business day between 8:00 am and 5:00 pm, and the site must be open for access.

  • 04

    What to know locally: The city uses the 2021 ICC codes and the 2020 NEC. Trade registrations renew yearly, from 60 days before to 30 days after expiration.

  • 05

    Utility coordination: New Braunfels Utilities (NBU). Inside city limits NBU needs proof of an approved city building permit. A passed city inspection is required before NBU releases orders to set temporary or permanent meters, and NBU does its own inspection after it receives the approved city inspection.

  • 06

    Typical review time: Not published by the city.

New Braunfels questions

  • 01

    Do electrical contractors have to register in New Braunfels? Yes. Electrical, plumbing, mechanical and irrigation contractors must register with the Building Safety Division through the online portal before working in city limits.

  • 02

    How do I schedule an inspection in New Braunfels? Use the city's online permit portal. Commercial inspections are scheduled for the next business day between 8:00 am and 5:00 pm.

  • 03

    When will NBU set my meter in New Braunfels? After the city inspection passes. NBU then needs a copy of the approved city inspection before it schedules its own inspection and releases the meter order.

Recent work near New Braunfels

Our recent projects are in Austin, Round Rock and Burnet. See the case studies.

New Braunfels facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-01 from: newbraunfels.gov newbraunfels.gov newbraunfels.gov newbraunfels.gov newbraunfels.gov nbutexas.com. Rules change; we confirm them on every permit.