Commercial electrician, Meadowlakes

Commercial Electrician in Meadowlakes, TX

Commercial electrical maintenance, repairs and projects for Meadowlakes facilities, from our shop in Round Rock.

Something down right now? Call (737) 301-4536

Permits and inspections in Meadowlakes

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: City of Meadowlakes. The city's Building Committee reviews construction plans at City Hall. The city posts its permit applications as PDF forms on the Building Committee page; no online permit portal was found.

  • 02

    How to apply: Use the city's paper forms: a Building Permit Application, a New Construction Application (builders packet) or a Remodel Application. Submit three sets of detailed drawings of the work to the Building Committee at City Hall. The city links an ATS Engineers plan review checklist with its permit forms.

  • 03

    Typical review time: The Building Committee says it reviews drawings within ten days of submittal. Drawings that are not approved are reconsidered at the next regular meeting after they are revised and resubmitted.

  • 04

    What to know locally: Meadowlakes is a Type A general law city. The city FAQ says a building permit is not needed for like-for-like repairs, but only when no electrical or plumbing work is involved, so electrical work needs a permit. The Building Committee page says construction must follow the International Codes and local ordinances, without naming editions. Construction hours are 7 a.m. to 7 p.m., Monday through Saturday.

  • 05

    Utility coordination: Pedernales Electric Cooperative (PEC). Meadowlakes is on PEC's list of franchise cities it serves. For new commercial service PEC asks for a site plan, a one-line electrical diagram, the 911 address, a warranty deed, an approved site plan and plat, and the service size in amps. PEC notes some areas require a city inspection before it connects.

  • 06

    Inspections: Not published by the city.

Meadowlakes questions

  • 01

    Does electrical work in Meadowlakes need a city permit? Yes in most cases. The city's FAQ only exempts like-for-like repairs that involve no electrical or plumbing work.

  • 02

    How long does Meadowlakes take to review plans? The Building Committee says it reviews drawings within ten days of submittal. You submit three sets of detailed drawings at City Hall.

  • 03

    When can contractors work in Meadowlakes? The city FAQ lists construction hours of 7 a.m. to 7 p.m., Monday through Saturday only.

Recent work near Meadowlakes

Our recent projects are in Austin, Round Rock and Burnet. See the case studies. We also serve the nearby communities of Fairland.

Meadowlakes facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-02 from: meadowlakestexas.org meadowlakestexas.org mypec.com mypec.com. Rules change; we confirm them on every permit.