Commercial electrician, Marble Falls

Commercial Electrician in Marble Falls, TX

Commercial electrical maintenance, repairs and projects for Marble Falls facilities, from our shop in Round Rock.

Something down right now? Call (737) 301-4536

Permits and inspections in Marble Falls

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: City of Marble Falls Development Services Department, through MGO Connect (MGOConnect.org). Outside city limits (the one-mile ETJ) the city does not issue electrical permits and refers owners to Burnet County.

  • 02

    How to apply: Apply and submit plans online through MGO Connect. Contractors, including electrical subcontractors, must register with the city on MGO Connect with a master license, driver's license and certificate of insurance. Electrical permits are separate and are pulled by the licensed electrical contractor doing the work.

  • 03

    Typical review time: Not published. The city says permits that need no plan review are issued right away; others vary.

  • 04

    Inspections: Call the city's 24-hour inspection hotline; requests are first come, first served and routed at the start of each day. A re-inspection fee applies from the third inspection of the same item and must be paid before more inspections are scheduled.

  • 05

    What to know locally: The city's commercial packet reviews plans to the 2024 IBC and 2023 NEC, though older city pages cite earlier editions. City water, sewer and trash cannot be turned on until a certificate of occupancy is issued.

  • 06

    Utility coordination: Pedernales Electric Cooperative (PEC). PEC asks for a 911 address, the service size in amps, and for commercial sites a warranty deed, approved site plan and plat. A one-line diagram may be needed. PEC notes some areas require a city inspection before it connects service.

Marble Falls questions

  • 01

    Who pulls the electrical permit on a commercial job in Marble Falls? The licensed electrical contractor doing the work. The city requires separate electrical permits, and the contractor must first register with the city on MGO Connect.

  • 02

    How do I request an inspection in Marble Falls? Call the city's 24-hour inspection hotline. Requests are first come, first served.

  • 03

    Do I need a Marble Falls electrical permit outside city limits? No. The city says it does not issue building or electrical permits in its extraterritorial jurisdiction and recommends contacting Burnet County.

Recent work near Marble Falls

Our recent projects are in Austin, Round Rock and Burnet. See the case studies.

Marble Falls facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-01 from: marblefallstx.gov marblefallstx.gov marblefallstx.gov marblefallstx.gov mypec.com mypec.com. Rules change; we confirm them on every permit.