Commercial electrician, Lago Vista

Commercial Electrician in Lago Vista, TX

Commercial electrical maintenance, repairs and projects for Lago Vista facilities, from our shop in Round Rock.

Something down right now? Call (737) 301-4536

Permits and inspections in Lago Vista

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: City of Lago Vista Development Services; online through the MGO Connect permitting portal

  • 02

    How to apply: Submit permit requests in the MGO Connect portal. Since January 1, 2023 most permits require the applicant to be registered with the City of Lago Vista; electrical permits go only to state-licensed electricians registered with the city (or people a master electrician designates in writing).

  • 03

    Inspections: Request inspections in the MGO Connect portal (the city publishes a Request an Inspection guide). Cutoff times and reinspection fees: Not published.

  • 04

    What to know locally: Ordinance 18-11-01-02 adopted the 2014 NEC with local amendments; a 2024 ordinance (24-04-04-04) amends the city's electrical code sections again; we confirm the current edition with the city on every permit. A building permit does not by itself authorize electrical work.

  • 05

    Utility coordination: Pedernales Electric Cooperative. PEC asks commercial applicants for an approved site plan and property plat, a one-line electrical diagram and the requested service size in amps. PEC notes some areas require city inspections before connection.

  • 06

    Typical review time: Not published by the city.

Lago Vista questions

  • 01

    Does my electrician need to register with Lago Vista? Yes. Since January 1, 2023 most permits require the applicant to be registered with the city, and electrical work must be done by state-licensed electricians registered with the city.

  • 02

    Does a Lago Vista building permit cover the electrical work? No. The city says a building permit does not authorize electrical, plumbing or mechanical installation; those need their own permits.

  • 03

    How do I schedule an inspection in Lago Vista? Inspections are requested through the city's MGO Connect permitting portal.

Recent work near Lago Vista

Our recent projects are in Austin, Round Rock and Burnet. See the case studies.

Lago Vista facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-01 from: lagovistatexas.gov lagovistatexas.gov lagovistatexas.gov lagovistatexas.gov lagovistatexas.gov lagovistatexas.gov. Rules change; we confirm them on every permit.