Commercial electrician, Johnson City
Commercial Electrician in Johnson City, TX
Commercial electrical maintenance, repairs and projects for Johnson City facilities, from our shop in Round Rock.
Something down right now? Call (737) 301-4536What Johnson City facilities call us for
For Johnson City facilities, most calls come down to two kinds of work:
Facility maintenance and repair.
Troubleshooting, panels, lighting, equipment power and recurring maintenance, with a written report after every visit.
Facility MaintenanceCommercial projects.
Tenant improvements, equipment power and service upgrades, designed, permitted and closed out by one electrical contractor.
Commercial ProjectsPermits and inspections in Johnson City
Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.
- 01
Who issues electrical permits: City of Johnson City Planning & Permits (Development Services). Bureau Veritas is the city's contracted Building Official.
- 02
How to apply: Trade work such as electrical needs a City of Johnson City permit, and subcontractor electrical work has its own permit procedure. Permit fees are paid at City Hall or by mail.
- 03
Inspections: The city schedules all inspection requests, including re-inspections. Requests for the next business day must be in by 4:00 pm. Commercial electrical inspections include underground, rough and final.
- 04
What to know locally: The city's code list names the 2015 NEC. Commercial buildings need a certificate of occupancy.
- 05
Utility coordination: Pedernales Electric Cooperative (PEC). PEC asks for a 911 address, the service size in amps, and for commercial sites a warranty deed, approved site plan and plat. A one-line diagram may be needed. PEC notes some areas require a city inspection before it connects service.
- 06
Typical review time: Not published by the city.
Johnson City questions
- 01
Do I need a permit for electrical work in Johnson City? Yes. The city says trade work such as electrical requires a permit from the City of Johnson City.
- 02
What is the inspection cutoff in Johnson City? Next-day inspection requests must reach the city by 4:00 pm.
- 03
Does a commercial building in Johnson City need a certificate of occupancy? Yes. Commercial structures need one; single-family homes do not.
Recent work near Johnson City
Our recent projects are in Austin, Round Rock and Burnet. See the case studies.
Johnson City facility? Start with the assessment.
You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.
Or call (737) 301-4536.
Sources
Permit and utility facts checked 2026-11-01 from: johnsoncitytx.org johnsoncitytx.org johnsoncitytx.org mypec.com mypec.com. Rules change; we confirm them on every permit.