Commercial electrician, Geronimo
Commercial Electrician in Geronimo, TX
Commercial electrical maintenance, repairs and projects for Geronimo facilities, from our shop in Round Rock.
Something down right now? Call (737) 301-4536What Geronimo facilities call us for
For Geronimo facilities, most calls come down to two kinds of work:
Facility maintenance and repair.
Troubleshooting, panels, lighting, equipment power and recurring maintenance, with a written report after every visit.
Facility MaintenanceCommercial projects.
Tenant improvements, equipment power and service upgrades, designed, permitted and closed out by one electrical contractor.
Commercial ProjectsPermits and inspections around Geronimo
Geronimo is unincorporated, so Guadalupe County rules apply.
Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.
- 01
Who issues electrical permits: Geronimo is an unincorporated community north of Seguin, with no city government. The Guadalupe County Fire Marshal's Office Permitting Department (Development Center, 310 IH-10 West, Seguin) permits commercial and public buildings in unincorporated areas through its CityWorks online portal.
- 02
How to apply: A county permit is needed to build a new commercial or public building, to remodel a building for a new type of business, to occupy a location for business, or to build multi-family housing with five or more units. Submit the application and full plans online. Drawings must be sealed by a Texas architect or engineer and include an electrical load analysis, electrical riser diagrams and ground and arc fault interrupter locations. If the project has a fire alarm system, the alarm contractor must get a separate Fire Protection System Permit; the county's checklist asks for battery and voltage drop calculations, a riser diagram and the primary and secondary power sources.
- 03
Typical review time: Guadalupe County says it has a maximum of 30 days to review plans and issue or deny a permit.
- 04
Inspections: Inspection requests are made in the Fire Marshal's portal for each system. The Fire Marshal's Office witnesses all final fire alarm testing. A final inspection leads to a Certificate of Compliance, which is required before the business opens.
- 05
What to know locally: Guadalupe County adopted the 2024 International Fire Code for unincorporated areas on January 27, 2026, and says the new edition adds tougher obligations for some businesses. Fire alarm systems need a separate county permit and a state fire alarm license for the designer, company and installers. The county does not list a separate electrical permit, so electrical design is reviewed as part of the building plans.
- 06
Utility coordination: Guadalupe Valley Electric Cooperative (GVEC). GVEC's service territory map places Geronimo inside GVEC's service area. GVEC's commercial checklist starts with the owner getting zoning, survey and any required permits, then sending GVEC a commercial request for information with the expected load and voltage needs. GVEC designs the route, gets easements and builds the line, transformer and metering point; the owner's electrician builds the secondary service to NEC standards. For new service GVEC also asks for deed and easement information, the service size, and whether it is overhead or underground, and says new installs take about 3 to 5 weeks.
Geronimo questions
- 01
Does a fire alarm in a Geronimo business need its own permit? Yes. Guadalupe County requires a Fire Protection System Permit pulled by the licensed alarm contractor, and the Fire Marshal witnesses final testing.
- 02
Which fire code applies in Geronimo? The 2024 International Fire Code, adopted by Guadalupe County for unincorporated areas on January 27, 2026.
- 03
What electrical drawings does Guadalupe County want for a Geronimo building? The county's submittal list asks for an electrical load analysis, electrical riser diagrams and ground and arc fault interrupter locations in sealed drawings.
Recent work near Geronimo
Our recent projects are in Austin, Round Rock and Burnet. See the case studies. We also serve the nearby communities of Barbarosa.
Geronimo facility? Start with the assessment.
You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.
Or call (737) 301-4536.
Sources
Permit and utility facts checked 2026-11-02 from: guadalupetx.gov guadalupetx.gov guadalupetx.gov guadalupetx.gov guadalupetx.gov experience.arcgis.com. Rules change; we confirm them on every permit.