Permits and inspections around Cedar Creek

Cedar Creek is unincorporated, so Bastrop County rules apply.

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: Cedar Creek is unincorporated. Bastrop County Development Services issues development permits through the MyGovernmentOnline portal. The county does not issue building permits.

  • 02

    How to apply: Commercial sites need a county Non-Single Family Development Permit: engineer-stamped civil plans, a drainage report, a TCEQ wastewater permit, and a letter from the Emergency Services District. Bastrop County says it does not issue building permits or certificates of occupancy.

  • 03

    Inspections: Not published. The county says it is not involved in inspecting residential structures, and it does not list a county electrical inspection.

  • 04

    What to know locally: Bastrop County's building code applies only to single-family homes and duplexes. For commercial work, Bluebonnet's meter loop inspection is a required step before power is connected.

  • 05

    Utility coordination: Bluebonnet Electric Cooperative. Bluebonnet inspects the meter loop at every new and existing location before connecting service. A failed loop must be corrected and re-inspected, at $125 per re-inspection. New service starts with a line design appointment and any easements or permits the county requires.

  • 06

    Typical review time: Not published by the city.

Cedar Creek questions

  • 01

    Do I need a county electrical permit in Cedar Creek? Bastrop County says it does not issue building permits or certificates of occupancy, and its building code covers only single-family homes and duplexes. Commercial sites still need a county development permit.

  • 02

    What does a commercial site in Cedar Creek need from Bastrop County? A Non-Single Family Development Permit with engineer-stamped civil plans, a drainage report, a TCEQ wastewater permit and a letter from the Emergency Services District.

  • 03

    Will Bluebonnet inspect before turning on power? Yes. Bluebonnet requires a meter loop inspection before any service connection. Each re-inspection after a failure costs $125.

Recent work near Cedar Creek

Our recent projects are in Austin, Round Rock and Burnet. See the case studies.

Cedar Creek facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-01 from: bastropcounty.gov bastropcounty.gov bluebonnet.coop bluebonnet.coop. Rules change; we confirm them on every permit.