Permits and inspections in Buda

Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.

  • 01

    Who issues electrical permits: Development Services Department; online through the MyGovernmentOnline portal

  • 02

    How to apply: Apply online through MyGovernmentOnline. Buda is a one-permit city: electrical subcontractors are listed on the building permit instead of pulling their own permit. A licensed contractor must be registered with the city (registration is processed in MyGovernmentOnline) and listed on the application.

  • 03

    Typical review time: Plan review typically takes about 10 to 15 business days, with more rounds if there are compliance issues.

  • 04

    Inspections: Inspections require at least 24 hour notice. Re-inspection fee: Not published on the pages checked.

  • 05

    What to know locally: Buda has adopted the 2023 National Electrical Code and the 2024 International codes, some with city amendments.

  • 06

    Utility coordination: Pedernales Electric Cooperative. PEC brings power to the site, sets the meter and energizes the service. The customer handles permits and inspections. Meter sockets must be UL listed and meet PEC specifications, and PEC will refuse service where a known hazard exists.

Buda questions

  • 01

    Does my electrician pull a separate permit in Buda? No. Buda is a one-permit city, so electrical subcontractors are listed on the main building permit. Sign and irrigation permits are separate.

  • 02

    How long does plan review take in Buda? The city says plan review typically takes about 10 to 15 business days, and can take more rounds if changes are needed.

  • 03

    How much notice does Buda need for an inspection? At least 24 hours.

Recent work near Buda

Our recent projects are in Austin, Round Rock and Burnet. See the case studies.

Buda facility? Start with the assessment.

You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.

Where the work is. We serve facilities within about 60 miles of downtown Austin.

A rough estimate is fine.

If yes, we'll ask you to send them after we talk.

Helps us send the report to the right people.

Or call (737) 301-4536.

Sources

Permit and utility facts checked 2026-11-01 from: budatx.gov budatx.gov budatx.gov mypec.com. Rules change; we confirm them on every permit.