Commercial electrician, Buchanan Lake Village
Commercial Electrician in Buchanan Lake Village, TX
Commercial electrical maintenance, repairs and projects for Buchanan Lake Village facilities, from our shop in Round Rock.
Something down right now? Call (737) 301-4536What Buchanan Lake Village facilities call us for
For Buchanan Lake Village facilities, most calls come down to two kinds of work:
Facility maintenance and repair.
Troubleshooting, panels, lighting, equipment power and recurring maintenance, with a written report after every visit.
Facility MaintenanceCommercial projects.
Tenant improvements, equipment power and service upgrades, designed, permitted and closed out by one electrical contractor.
Commercial ProjectsPermits and inspections around Buchanan Lake Village
Buchanan Lake Village is unincorporated, so Llano County rules apply.
Our electrical contractor license (TECL #39622) is statewide. We file the permit, handle the utility paperwork and meet the inspector.
- 01
Who issues electrical permits: Buchanan Lake Village is unincorporated. Llano County Development Services (100 W. Sandstone Street, Llano) handles development, OSSF (septic), road cut, plat and 911 addressing applications through its online iWorQ portal.
- 02
How to apply: Apply online through Llano County's iWorQ portal. The county reviews each application against Commissioners Court orders, and other local, state or federal approvals may be needed before it issues a permit. No county electrical permit is listed. For new development in a Zone A floodplain, the county asks for an elevation certificate, a site plan with ground elevations at the four outer corners, and plans showing foundation, anchoring and flood vents; Zone AE adds an engineer's statement on flood rise.
- 03
Typical review time: Llano County asks for 7 to 10 business days for non-floodplain determinations, and says floodplain development, septic permits and commercial projects may take longer.
- 04
What to know locally: Marinas on Lake Buchanan need an LCRA permit under the Highland Lakes Marina Ordinance, which also covers floating docks over 1,500 square feet. Residential docks must meet LCRA's dock safety standards.
- 05
Utility coordination: Not confirmed by address. Central Texas Electric Cooperative and Pedernales Electric Cooperative both list Llano County in their service areas. CTEC's new construction process starts with its Member Services Department and the property's 911 address. A staking technician meets on site to set line and meter locations, and all paperwork and fees must be complete before construction is scheduled.
- 06
Inspections: Not published by the city.
Buchanan Lake Village questions
- 01
How long does Llano County take to review a development application? The county asks for 7 to 10 business days for non-floodplain determinations, and longer for floodplain, septic and commercial projects.
- 02
Does a lakefront marina need an LCRA permit? Yes. LCRA says all marinas on Lake Buchanan need an LCRA permit, as do floating docks over 1,500 square feet.
- 03
Which co-op serves Buchanan Lake Village? Both CTEC and PEC serve Llano County. CTEC's website has a service territory lookup; check the address before design.
Recent work near Buchanan Lake Village
Our recent projects are in Austin, Round Rock and Burnet. See the case studies.
Buchanan Lake Village facility? Start with the assessment.
You get a ranked list of what needs attention, budget ranges and a written scope. If there is a fee, it is credited toward the work when you approve within 30 days.
Or call (737) 301-4536.
Sources
Permit and utility facts checked 2026-11-02 from: newtools.cira.state.tx.us newtools.cira.state.tx.us ctec.coop ctec.coop mypec.com lcra.org. Rules change; we confirm them on every permit.