Capital TI Group: Engineering Office TI in Austin

Project

Office TI for an engineering firm, with Capital TI Group as the general contractor

City

Austin

Electrical scope

Electrical subcontractor to Capital TI Group, the general contractor, on an engineering firm's office suite. Built from the construction drawings: new light fixtures with Lutron Vive wireless controls, new receptacles, three power poles and a floor box for the workstations, conduit stubs for the furniture system, a recessed media box, and back boxes and plenum cable for six fire alarm strobes.

Timeline

About two months, January to March 2026.

Electrical outcome

City coordination and a quick turnaround. We handled the city inspections ourselves, the wall rough-in passed inspection, and the suite was finished in about two months.